Albany roofing companies should be installing drip edge from the bottom of the rake up with each piece overlapping the next to prevent water infiltration.
Repairing drip edge on roof.
Align one end of the lower eave strip even with the edge of the roof decking.
Home centers sell rolls of 6 in.
Ask this old house general contractor tom silva demonstrates the importance of a properly installed drip edge subscribe to this old house.
Install roof drip edge along the eaves add underlayment then place drip.
At 7 05 paul begins replacing the drip edge roof flashing use a flat pry bar to remove drip edge nails along the eave and rakes.
Lift up roof shingles and nail the eave strip in place with galvanized.
Cut out the damaged section with a circular saw.
Raise the shingles and push the top rim of your drip edge beneath them.
If there s a drip edge installed where the fascia meets your shingles and the gutter is hung below the drip edge get some roll flashing and tuck it up under the drip edge and over the top of the gutter.
Once all the underlayment is applied go back and place.
How to fix a roof drip edge installing roof drip edge flashing properly.
Save yourself some.
To locate rotted areas of the roof s edge gently lift up shingles with a pry bar or taping knife.
And apply a uniform layer into the nailed seams at each area with a plastic putty knife.
You may need to use a putty knife to break the seam between the first course and the starter strip.
Extend the mastic 12 inches each way from a nailed seam and eight inches.
But do not push it through the fascia.
Slide the flat bar under starter course and pry out the nails.
Drip edge should always be cut with as few seams as possible to give a cleaner more seamless look.
Install the eave strips on the lower roof edges first with the eave strips under the shingles and felt underlayment.
Use tin snips to cut the gutter apron flashing roll in two 3 in.
Replacing drip edge eave strips.
Place the metal roof drip edge flashing along the gable ends.
Tack the end into position with the roofing nails and press the nail within the drip edge and into the roof covering.
Open a container of roofing mastic.